Dave & Cathy’s Naperville Hall Bathroom Remodel
Project Details
These clients had a distinct vision for their hall bathroom remodel from the very beginning. More specifically, they knew they wanted a darker-stained vanity cabinet and marble-looking porcelain tile to coordinate. We removed their outdated bathtub and moved the toilet closer to the vanity to allow for a large walk-in shower. Within the shower, we included not only 2 separate niches, but also a built-in shaving nook. As this was primarily a bathroom for a teenage girl, we made sure to incorporate a lot of drawers for storage. We kept the design neutral however, not steering towards too feminine, as resale value was a concern. One interesting aspect of this remodel is the mirror. It is actually a floor mirror that we mounted horizontally for a framed look. And we think it fits perfectly and actually elongates the space.