On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.

TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS

BASIC LEVEL

$100K+
  • Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)
  • Porcelain Tile Floor & Shower Walls
  • Level 2 Plumbing Fixtures
  • Level 2 Vanity Cabinetry
  • Granite/Quartz Remnant Top
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures Remain in the Same Locations

MID LEVEL

$115K+
  • Remove Existing Tub & Shower. Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
  • Porcelain Tile Floor, Shower Base & Walls
  • Level 3 Plumbing Fixtures
  • Level 3 Vanity Cabinetry
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Limited Fixture Movement

UPPER LEVEL

$130K+
  • Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
  • Natural Stone Floor, Shower Base & Walls
  • Level 4 Plumbing Fixtures
  • Level 3 Vanity Cabintry w/Linen Cabinet
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures May be Moved

INCLUDED:  Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.

NOT INCLUDED:  Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.

Examples of large sized bathrooms we have completed:

GUEST HALL BATH (5′ x 8′)

On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.

TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS

BASIC LEVEL

$40K+
  • Keep Existing Tub
  • Ceramic Tile Floor & Shower Walls
  • Level 1 Plumbing Fixtures
  • Level 1 Vanity Cabinetry
  • Level 1 Granite Remnant Top
  • Electrical Updates
  • Shower Door NOT Included
  • Fixtures Remain in the Same Locations

MID LEVEL

$47K+
  • Replace Existing Tub with Tub or Fiberglass Shower Base
  • Porcelain Tile Floor & Shower Walls
  • Level 2 Plumbing Fixtures
  • Level 2 Vanity Cabinetry
  • Granite/Quartz Remant Top
  • Electrical Changes/Updates
  • Shower Door NOT Included
  • Fixtures Remain in the Same Locations

UPPER LEVEL

$55K+
  • Remove Tub & Replace with Tile Base Shower
  • Porcelain or Natural Stone Tile Floor & Shower
  • Level 3 Plumbing Fixtures
  • Level 3 Vanity Cabinetry
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures May Be Moved

INCLUDED:  Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.

NOT INCLUDED:  Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.